MAINETEC PROJECTS

Clermont Dipper Handles

Client:

Glencore

Site:

Clermont Coal

Project:

4100XPC Shovel Dipper Handle Refurbishment

 Description:

Mainetec strip, cleaned and assessed to Handles on arrival to the workshop. Mainetec develop a SOW which included various upgrades, including baffles. The Handle were fitted with a new set L&H Industrial Racks as part of the refurbishment.  

Purpose:

Mainetec refurbished the Handles as a spare set for site to reduce the exposure to risk on site with the potential for the current set fit to fail at anytime.

Timeframe:

Project duration was 20 weeks from arrival in shop to completion of refurb.

Boundaries/ Obstacles:

 

People involved:

Combined effort from Mainetec’s on-site & workshop group, along with Clermont’s maintenance team.

Innovation:

Baffle upgrade, this will create less cracking in the handles plus removable plate for inspecting internals.

Success:

The handles have been since been fitted to the machine in late October 2018.

 

 

 

 

 

 

 

 

 

 

 

CONTACT US

Your project could be next – contact us today to see what we can do for you.
Please feel free to contact us at any time.

Address

21 Gateway Drive
Paget QLD 4740

Phone

07 4955 7888

Email

admin@mainetec.com.au